Booking surveys for next week across Greater Manchester, Cheshire and Lancashire

Offices and workspaces

Office air conditioning
in Manchester

A floor plate with a glass south wall and a cold north corner needs zoning, not a bigger unit. We survey how the space is actually used through the working day, size against the real heat load, and fit in the evenings so nobody loses a desk.

  • Zoned controlroom by room, not floor by floor
  • Eveningsfitted outside office hours
  • From £2,450one cassette, installed

In short

CoolIn designs, installs and maintains office air conditioning across Manchester city centre and the wider North West, from a single meeting room to a multi floor VRF system. Most office work is done outside trading hours at standard labour rates, so the floor is usable the next morning.

Typical systems
Ceiling cassettes, slim ducted, VRF
One room
From £2,450 installed
Open plan floor
Around £8,500 for four cassettes
Fitting hours
Evenings and weekends, standard rates
Compliance
TM44 over 12kW, F-Gas over 5 tonnes CO2e
Servicing
From £89 per indoor unit per year

What makes offices difficult

Why an office is harder to cool than the floor area suggests

Nearly every office we are called back to was sized off a square metre rule of thumb. Four things break that rule, and all four are visible on a survey if anyone bothers to look.

The glass side and the cold side

A south or west facing elevation can take a room several degrees above the one behind it on the same floor, and the gap moves through the day. One system set to one temperature will always be cooling one half and overcooling the other. The fix is zoning at design stage, not a compromise setpoint later.

Solar gain modelled per elevation

The meeting room that fills at two o'clock

A person sitting at a desk gives off roughly the heat of a small light bulb, and a room of twelve in a glass box with the door shut climbs fast. Meeting rooms are the single most common complaint in an office, and they are almost always undersized because they were counted as floor area rather than as people.

Sized on occupancy, not square metres

Equipment nobody counted

Desktop machines, monitors, a printer, and the comms cupboard that runs a switch and a firewall every hour of the year. In a small office that stack can be a meaningful share of the total load, and the comms cupboard often needs its own dedicated cooling rather than a share of the open plan system.

Equipment load added to the calculation

Everyone has a different opinion

Give a floor one controller and you get a thermostat war. We set zones that match how people actually sit, lock the range so nobody can drive it to 16 degrees, and hand over the controls to whoever runs the office rather than leaving a remote in a drawer.

Locked setpoint ranges as standard

The options

Which system suits your office

The ceiling decides most of this. What sits above the tiles, and whether there is a void at all, narrows the options before anything else does.

01

Ceiling cassette

The default where there is a suspended ceiling. Sits flush in a tile grid, throws air four ways, and is the cheapest route to even coverage across open plan. Needs around 300mm of void.

02

Slim ducted

The unit hides in the void and feeds linear grilles, so the ceiling stays clean. The usual choice on a designed fit out, or where a landlord or a listed frontage will not accept visible plant.

03

VRF and VRV

One outdoor unit serving many indoor ones, with heat recovery moving heat from the sunny side to the shaded side rather than dumping it outside. Worth the extra capital cost from roughly six indoor units upward.

04

Wall mounted split

Cheapest per room and the right answer for a small office, a single meeting room, or a period building with no ceiling void to work with.

Budget

What office air conditioning costs

Installed prices covering equipment, labour, commissioning and handover. Commercial jobs are priced per project because ceiling voids, riser routes and access all move the figure, so treat these as budget bands rather than quotations.

Guide prices, installed. Confirmed at site survey.

Small office

Up to about 30 square metres. Installed prices

  • Wall unit, 5kW£2,280
  • Single cassette, 3.5kW£2,450
  • Meeting room, one unitfrom £2,450
  • Two rooms, one condenser£4,400

Office floor

Open plan plus meeting rooms. Installed prices

  • Four cassette system£8,500
  • Slim ducted, two zones£3,500
  • Six unit VRF£14,000
  • Heat recovery ventilation£5,200

Multi floor

Whole building or phased fit out. Installed prices

  • VRF, whole buildingper project
  • Comms room close controlfrom £9,000
  • Plant replacementper project
  • Phased floor by floorper project

These are guide bands, not quotations. An office quote from us shows the heat load calculation for each area with the working visible, an equipment schedule with positions and pipework routes, the electrical requirement, and a programme set around your working hours. The survey costs nothing and the written price does not move.

Compliance and tenancy

The duties that come with an office system

Two of these are law and catch more offices than people expect. The third is not law at all, and is the one that costs tenants money at the end of a lease.

TM44 inspections

Any building with air conditioning over 12kW of effective rated output needs an inspection by an accredited energy assessor at least every five years. That threshold is far lower than most office managers assume.

Four 3.5kW cassettes on one floor already cross it. So does a single small VRF. The duty sits with the building owner or whoever controls the system, not with the company that fitted it, and the report goes on the national register.

We flag systems that are over the threshold during servicing, so a renewal date never arrives as a surprise.

F-Gas record keeping

Systems are measured by the refrigerant they hold converted into tonnes of CO2 equivalent. Past 5 tonnes, the operator has to arrange leak checks and keep records. With R32 that line sits at roughly 7.4kg of refrigerant.

A handful of cassettes on separate condensers will usually sit under it. An office VRF almost always sits over it, and then the duty is annual at minimum. The full thresholds are set out on the commercial page.

Nobody opens a refrigerant circuit on your system without current F-Gas certification. That is a legal requirement for handling refrigerant, not a preference.

Landlord consent and dilapidations

Most office leases require written consent before plant is fixed to the structure or a core is drilled through an external wall, and a serviced building will often have its own rules about condenser positions and roof access.

The part tenants miss is the other end. A lease that requires reinstatement means stripping the system out and making good when you leave, which is a cost worth pricing before you commit rather than discovering at exit.

We will put the equipment schedule and condenser positions in writing for a landlord application, which is normally what gets consent moving.

How it works

Survey, fixed quote, fitted around you

A free survey, a written price with the heat load working shown, and a programme set around your hours. The four stages are the same on every commercial job and are set out in full on the commercial page, along with servicing plans and what to do about breakdowns.

We fit office systems across Manchester city centre, Salford Quays, Spinningfields and the wider North West, including Manchester, Salford, Stockport, Warrington and Liverpool. See every town we cover.

Other business types

We work in these too

Each sector has its own page, because a server room and a hair salon are genuinely different jobs. The commercial overview covers what applies to all of them.

Questions

What offices customers ask first

Can you install without closing the office?

Yes, and most office work is done this way. We work evenings and weekends at standard labour rates rather than a premium, sheet and clear the area each night, and phase larger floors so only one part of the office is affected at a time. A single meeting room is usually one evening.

How much mess does it make to a suspended ceiling?

Cassettes drop into the existing grid, so the tiles come out and go back. Pipework runs in the void. The visible work is the core through the external wall for the pipe route and the condenser position outside, and those are the two things worth agreeing with your landlord before we start.

Does every room need its own unit?

No. Open plan is normally covered by several units on shared control, while meeting rooms and any room with a different aspect get their own zone. The point of zoning is that the rooms that behave differently are controlled differently, not that every door gets its own box.

What does it cost to run?

A modern inverter system uses around a quarter to a third of the electricity of an old fixed speed one for the same output, because it modulates rather than cycling on and off. As a rough figure, a 3.5kW cassette holding a meeting room on a warm afternoon draws roughly the power of a desktop computer and a monitor once it has pulled the room down.

Do we need a TM44 inspection?

If the installed air conditioning in the building is over 12kW of effective rated output, yes, at least every five years, with the first within five years of the system going into service. Four 3.5kW cassettes cross the line. The duty is the building owner's or the operator's, not the installer's.

How long does a full floor take?

A four cassette open plan floor is typically three to five days on site including commissioning. A VRF system across several floors is programmed floor by floor and quoted with a written programme, so you know which week affects which team.

Free survey

Tell us about the space and we will do the rest

Fill this in and an engineer will call you back the same working day. No sales visit, no pressure, and a written quote within 48 hours of the survey.

  • Survey and quote at no cost
  • Fixed price, valid for 60 days
  • Nothing to pay until the job is finished
  • Two year guarantee on our workmanship

Prefer to talk it through

07391 523255

We use your details to quote for this job and nothing else. No lists, no third parties.

WhatsApp Call us